Site start
Housing site start — Malahide
Malahide, Dublin
2 commencement notices · latest start date 10 Mar 2022 · planning reference given
Planning F18A/0317 · Planning application
- Commencement notices
- 2
- Latest start date
- 10 Mar 2022
- Latest notice
- 111 m²
- Planning reference
- F18A/0317
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
the removal of an existing chimney to side, at 12, Island view & the construction of a new 3-bedroom detached dwelling to side, at 12, Island View Malahide
Floor area stated for this source: 111 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
The removal of an existing chimney to gable of No 12, Island View, Malahide & the construction of a new 3-bedroom detached dwelling to side, including a new vehicular entrance beside the existing vehicular entrance, all at 12, Island View, Malahide Co Dublin
Floor area stated for this source: 111 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.