Site start

Housing site start — Sandyford

Sandyford, Dublin 18, Dublin

1 commencement notice · start date 13 Aug 2025 · planning references given

Planning ABP-312718-22 D21A/0749

Commencement notices
1
Latest start date
13 Aug 2025
Latest notice
Scale not stated
Planning references
D21A/0749 · ABP-312718-22
Location
Sandyford, Dublin 18, Dublin

Location

Where the site is

Area
Sandyford, Dublin 18, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-312718-22. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

One Beacon Apartments & Beacon Hospital Basement Works, Sandyford, Dublin 18 comprising material alterations & change of use of meeting rooms to apartments, alterations to store rooms, toilets, lift shaft & construction of energy centre.

Work stated for this notice Scale not stated for this notice.
Planning reference D21A/0749 Appeal reference ABP-312718-22

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.