Site start
Material Alteration at 16 Sackville Place
Dublin 1, Dublin
1 commencement notice · start date 27 Jun 2024 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 27 Jun 2024
- Latest notice
- 235 m²
- Planning references
- None given
- Location
- Dublin 1, Dublin
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Material Alteration at 16 Sackville Place (a) Install new fire door to basement level. (b) Change existing internal door to fire door at ground floor level. (c) Remove existing exit from the Sackville lounge which opens into stair serving the residential occupancy on the first/second floor level.
Floor area stated for this source: 235 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.