Site start

Site start — Dublin

Dublin

1 commencement notice · start date 22 Jun 2026 · planning reference given

Planning ABP-320106-24

Planning story

Santry Avenue LRD

Exact official references
ABP-320106-24
Final official decision
Granted with revised conditions
Commencement notices
1
Latest start date
22 Jun 2026

No overall constructed, completed-unit or percentage-progress figure is inferred from these notices.

Commencement notices
1
Latest start date
22 Jun 2026
Latest notice
283 units
Planning reference
ABP-320106-24
Location
Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
1
Repeat copies merged
0
Completion certificates
0

Appeal Case · ABP-320106-24

ABP-320106-24 has an exact reviewed appeal case relationship; the parent reference is not published in this projection.

An Coimisiún Pleanála · checked 2026-07-30T16:14:00+01:00

Open exact official relationship evidence

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Reviewed planning, commencement and document evidence

View the dossier catalogue

Exact reviewed project dossier for ABP-320106-24, ABP-320106-24 under Dublin City Council, retaining 1 separate commencement identities.

Commencement identities
1
retained separately
Latest group date
2026-06-22
not assigned across events
Maximum on one notice
283 units
never summed
Reviewed index
6
6 exact document links

Planning and appeal references

Every retained commencement event

  • 2026-06-22 Commencement notice 283 units on this event · 6263 m² on this event

Exact organisation roles

  • Dublin City CouncilPlanningauthority · Authority retained with the exact reviewed planning identity.
  • An Coimisiún PleanálaAppealauthority · Exact appeal identity retained in the reviewed evidence.

Explicit facts with official citations

Each statement keeps its exact reference, official title or drawing-title locator, and review state.

  • Appealcase Exact official case identity ABP-320106-24 is indexed for this dossier. ABP-320106-24 · 320106 - eiar volume 1 non technical summary.pdf · 320106 - eiar volume 1 non technical summary.pdf · reviewedexactdestination Open official evidence
  • Appealcase Exact official case identity ABP-320106-24 is indexed for this dossier. ABP-320106-24 · 320106 - eiar volume 1 non technical summary.pdf · 320106 - eiar volume 1 non technical summary.pdf · reviewedexactdestination Open official evidence
  • Commencementevent Official commencement notice dated 2026-06-22 is retained as a separate event. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Dwellingmix Notice states 283 units for that event; it is not summed with other notices. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Floorarea Notice states 6263 m2 for that event; it is not treated as project total. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Otherreport The exact official file index lists "320106 - eiar volume 1 non technical summary.pdf". ABP-320106-24 · 320106 - eiar volume 1 non technical summary.pdf · 320106 - eiar volume 1 non technical summary.pdf · reviewedexactdestination Open official evidence
  • Decisionorder The exact official file index lists "Appeal decision and documents". ABP-320106-24 · Appeal decision and documents · Appeal decision and documents · reviewedexactdestination Open official evidence
  • Inspectorreport The exact official file index lists "Inspector's report". ABP-320106-24 · Inspector's report · Inspector's report · reviewedexactdestination Open official evidence
  • Decisionorder The exact official file index lists "Order". ABP-320106-24 · Order · Order · reviewedexactdestination Open official evidence
  • Decisionorder The exact official file index lists "Direction". ABP-320106-24 · Direction · Direction · reviewedexactdestination Open official evidence
  • Decisionorder The exact official file index lists "Meeting record". ABP-320106-24 · Meeting record · Meeting record · reviewedexactdestination Open official evidence

Official document index highlights

Reviewed exact official destinations and explicit index titles; this is not asserted to be the complete authority file.

Location

Where the site is

Area
Dublin
County
Dublin

Addresses on the notices

  • Blocks A, B, C Santry Avenue, Dublin 9
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official drawings and scanned-file sources are available below.

Verified official planning and document destinations are available for this exact authority-local reference.

Use the official drawings or scanned files to review the submitted plans and elevations.

  • Official environmental report 320106 - eiar volume 1 non technical summary.pdf Listed on the exact official case page for ABP-320106-24. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open EIAR document · external
  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-320106-24. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external
  • Official decision document Inspector's report Listed on the exact official case page for ABP-320106-24. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open inspector’s report · external
  • Official decision document Order Listed on the exact official case page for ABP-320106-24. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open order · external
  • Official decision document Direction Listed on the exact official case page for ABP-320106-24. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open direction · external
  • Official decision document Meeting record Listed on the exact official case page for ABP-320106-24. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open meeting record · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Construction of foundations, retaining elements and transfer structure under basement level at Blocks A, B, C Santry Avenue, Dublin 9

Work stated for this notice 283 units Explicit phase quantity stated by the source.

Floor area stated for this source: 6,263 m².

Appeal reference ABP-320106-24 Developer stated: Dwyer Nolan Developments Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.