Site start
Building extension site start — Ballymore Eustace
Ballymore Eustace, Kildare
1 commencement notice · start date 31 Oct 2025 · planning reference given
Planning 23/840 · Council file · external
- Commencement notices
- 1
- Latest start date
- 31 Oct 2025
- Latest notice
- 2 units
- Planning reference
- 23/840
- Location
- Ballymore Eustace, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 23/840 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Ballymore Eustace, Kildare
- County
- Kildare
Addresses on the notices
- Chapel Street, Ballymore Eustace
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 23/840. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Carry out renovation works and to construct 2 no. single storey extensions to the rear of 2 no. attached cottages at Chapel Street, Ballymore Eustace. 2. Cottage no. 1 located at Eircode (formally known as Deegans) has an existing floor area of 30.09 sq.m and the proposed extension will add 85.90 sq.m. 3. Cottage no. 2 located at Eircode (formally known as Marshalls) has an existing floor area of 28.93 sq.m and the proposed extension will add 88.24 sq.m. Revised by Significant Further Information which consists of (1) Retention Permission now sought for the excavation works to the rear which reduces the levels to provide a level area to the rear of both cottages which extends out to 15m from the rear walls. The ground is then sloped up to the original garden level. (2) Permission to carry out renovation works and to construct two no. single storey extensions to the rear of two no. attached cottages at Chapel Street, Ballymore Eustace. Cottage no. 1 located at Eircode (formally known as Deegans) has an existing floor area of 30.09sq.m and the proposed extension will add 74.67sq.m. Cottage no. 2 located at Eircode (formally known as Marshalls) has an existing floor area of 28.93sq.m and the proposed extension will add 72.93sq.m at Chapel Street, Ballymore Eustace, Kildare which was received on the 25/04/2025 16:03.
Floor area stated for this source: 172 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.