Commencement notice group
Housing commencement notices — Malahide
Malahide, Dublin
1 separate notice · latest notified commencement 02 Jun 2026 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 02 Jun 2026
- Latest notice
- 1 unit
- Planning references supplied
- F25A/1146
- Public location
- Malahide, Dublin
Public source geography
Site location
- Public site / locality
- Malahide, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development will consist of a proposed new ground floor extensions to the existing dwelling. Demolish existing roof & replace with a new partial gable roof & partial flat roof. The new gable roof will be 450mm higher than existing roof ridge line. 2No. proposed new flat roof dormers to the rear of the new roof. 1No. proposed new flat roof dormer to the front of the new roof. 4No. new Velux's to the front of the new roof for light in hallway. The new attic space to be used for office & play area. A partial ground floor extension to the existing garage and replacing existing roof with new flat roof and all ancillary works.
1 unit · 155 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.