Site start

Site start — Dublin

Dublin

2 commencement notices · latest start date 22 Feb 2019 · planning reference given

Planning 3342/16

Commencement notices
2
Latest start date
22 Feb 2019
Latest notice
2,000 m²
Planning reference
3342/16
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Material Alterations: First Fit-Out Works For the Next Unit. Works to include M&E, Sprinklers, Escalator installation and final finishes to the Unit. Works will also include the list of Deferred Items that was agreed with the Landlord Developer and Dublin City Council: Front Sliding Doors; Emergency Lighting; Internal Fire Safety Signs; Voice Alarm; Lift Shaft Openings; Sprinkler Fit-out and Escalator openings.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,000 m².

Planning reference 3342/16
Notice 2 Seven-day notice

Demolition of the basement and ground floor slabs, walls, and stairs in certain locations. - Provide underpinning to relevant walls at basement level - Construction of new floor slabs at basement and ground levels - Construction of new concrete and masonry blockwork walls to basement, ground, 1st and 2nd floors - New stairs to be provided in stair cores in conjunction with upgrading of fire rated walls and fire doors with associated fire detection equipment - Supply and install structural steelwork and upgrading of existing structural columns including removal of certain structural columns. Together with creating a grey box to the basment, ground, first and 2nd floors with an isolated power supply and new facade to the front elevation.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference 3342/16

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.