Commencement notice group
Housing commencement notices — Dromod
Dromod, Leitrim
1 separate notice · latest notified commencement 30 Jan 2020 · planning basis not stated
- Source notices
- 1
- Latest notified commencement
- 30 Jan 2020
- Latest notice
- 111 m²
- Planning references supplied
- None stated
- Public location
- Dromod, Leitrim
Public source geography
Site location
- Public site / locality
- Dromod, Leitrim
- County
- Leitrim
Public site labels seen across the notices
- the south west of the site along the western fence and the rear of Warren Lodge - existing main house
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
7 day notice fire safety certificate application for the development consisting of construction of a single story, semi-detached self-catering cottage style holiday accommodation consisting of 2 no. individual 1 bedroom units. Proposed location is at the south west of the site along the western fence and the rear of Warren Lodge - existing main house. Warren Lodge is a protected structure. All ancillary site works at the curtilage of Warren Lodge, Main St, Clooncolry, Dromod, County Leitrim.
111 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.