Commencement notice group
Housing commencement notices — Leixlip
Leixlip, Kildare
1 unique commencement event · latest notified commencement 11 Dec 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 11 Dec 2023
- Latest notice
- 7 units
- Planning references supplied
- 23/607
- Public location
- Leixlip, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 1
- Open exact official planning record: 23/607 Kildare County Council
- Completion certificate recorded — source scope not stated Kildare County Council · commencement SN0009552KE Certificate CC00000055611KE · First observed in the official monthly source 2023-12 7 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Leixlip, Kildare
- County
- Kildare
Notice location variants
- first floor above Tuthills retail unit SN0009552KE
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 23/607. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of: a) amendments to balcony arrangement of permitted 2no. 2-bed apartments at first floor above Tuthills retail unit; b) construction of a three storey 'own door' apartment block consisting of 3 no. 1-bed apartments at ground floor and 3 no. 2-bed duplex apartments at first and second floor with all apartments accessed off the communal open space to the rear; c) construction of 1 no. studio apartment at first floor, with 'own door' access from the public street, resulting in a total of 9 no. apartments; d) demolition of existing retail store and amendments to the storage facilities; f) bicycle storage facilities for 18no. bicycles; g) Communal open space accessed via a pedestrian archway; h) associated site development works and services
Floor area stated for this source: 612 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.