Site start

Commercial site start — Ballybunion

Ballybunion, Kerry

1 commencement notice · start date 18 Nov 2015 · planning reference given

Planning 15613 · Council file · external

Commencement notices
1
Latest start date
18 Nov 2015
Latest notice
1 unit
Planning reference
15613
Location
Ballybunion, Kerry

Location

Where the site is

Area
Ballybunion, Kerry
County
Kerry

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

(a) refurbish an existing single storey disused commercial property to be used as a Cafe/Deli/Bakery which is a protected structure RPS 21400106 with proposed elevational modifications (b) extend the existing property to the rear with the addition of a single storey extension to be used as a commercial kitchen, toilet facilities and ancillary spaces to service the new Cafe/Deli/Bakery (c) include modifications to the rear of the existing building converting 2 existing rear windows to doors to access the new extension housing the kitchen, toilet facilities and ancillary spaces (d) the provision of an open air service yard with double gates to the rear of the property (e) to demolish existing front fence and gate and replace with a low masonry wall and new entrance gate (f) the addition of an awning to the front elevation (g) the addition of new commercial signage to the front elevation and road side (h) landscape the existing front courtyard with the addition of new external seating within the curtilage of the site to be used by the Cafe/Deli/Bakery and all associated site works at Main Street, Ballybunion, Co. Kerry

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference 15613

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.