Commencement notice group
Cricket centre — commencement notices
Blanchardstown, Dublin 15, Dublin
1 separate notice · latest notified commencement 27 May 2026 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 27 May 2026
- Latest notice
- 3,783 m²
- Planning references supplied
- FW25A/0173E
- Public location
- Blanchardstown, Dublin 15, Dublin
Public source geography
Site location
- Public site / locality
- Blanchardstown, Dublin 15, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of phase one of a Cricket centre development comprising the cricket oval and spectator seating bowl with access provision and ancillary features to the oval, an energy centre building, maintenance shed building and two toilet block buildings. The development at this phase also includes parking, access roads, bus and cycle infrastructure, landscaping, drainage works, temporary event overlay areas and all associated site development works, including retention of existing access, landscaping and parking associated with the practice nets.
3,783 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.