Site start

Portiuncula Hospital — site start

Ballinasloe, Galway

1 commencement notice · start date 10 Jun 2022 · planning references given

Planning 20/601, 16/704, 21/1550

Commencement notices
1
Latest start date
10 Jun 2022
Latest notice
4,355 m²
Planning references
16/704 · 20/601 · 21/1550
Location
Ballinasloe, Galway

Location

Where the site is

Area
Ballinasloe, Galway
County
Galway

Addresses on the notices

  • Portiuncula Hospital, Ballinasloe and all associated ancillary site works
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of a new 50 Bed Ward Block Extension at Portiuncula Hospital, Ballinasloe and all associated ancillary site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 4,355 m².

Planning reference 16/704 Planning reference 20/601 Planning reference 21/1550

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.