Commencement notice group
Housing commencement notices — Gorey
Gorey, Wexford
2 unique commencement events · latest notified commencement 17 Aug 2026 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 17 Aug 2026
- Latest notice
- 1 unit
- Planning references supplied
- 20240368
- Public location
- Gorey, Wexford
Verified project chain
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 20240368 Wexford County Council
Planning, commencement and completion remain separate exact-source events. Completion certificates are shown only after the official planning, commencement, certificate and PDF evidence chain passes; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Gorey, Wexford
- County
- Wexford
Notice location variants
- Tara Hill, Wexford CN0125687WX
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wexford County Council planning record Application details, status and decision record for 20240368. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Remodelling of existing derelict bungalow and construction of extension with associated siteworks
Floor area stated for this source: 263 m².
Structural alterations and re- modelling of the existing derelict bungalow dwelling house on the site (115 sq.m) to include the construction of a single storey extension of some 120 sq.m, together with a set-back, two- storey addition of 28 sq.m, all providing a new, single-family dwelling house of a total 263 sq.m; demolition of existing sheds; removal of existing septic tank and associated percolation area; the construction of a new wastewater treatment system and associated new percolation area; relocation of bored well; removal of the second entrance location; construction of a detached, single storey garage (42 sq.m) and the carrying out of all associated site works
Floor area stated for this source: 568 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.