Site start

Building extension site start — Blackrock

Blackrock, Dublin

1 commencement notice · start date 20 Jan 2017 · planning reference given

Planning D16B/0353 · Planning application

View full project timeline

Commencement notices
1
Latest start date
20 Jan 2017
Latest notice
1 unit
Planning reference
D16B/0353
Location
Blackrock, Dublin

Location

Where the site is

Area
Blackrock, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Permission is sought for new single storey covered side passage and new ground floor window in gable wall to side of No. 5 Glenvar Park and for new re-aligned boundary wall between No. 5 and No. 7 Glenvar Park, Blackrock, Co Dublin. The development involves the demolition of an existing detached garage and detached shed to the side of no. 7 Glenvar Park.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference D16B/0353

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.