Site start
Commercial site start — Dublin
Dublin 15, Dublin
1 commencement notice · start date 26 May 2022 · planning reference given
Planning Fw15A/0075/E1
- Commencement notices
- 1
- Latest start date
- 26 May 2022
- Latest notice
- 3,720 m²
- Planning reference
- FW15A/0075/E1
- Location
- Damastown Rise, Damastown Industrial Estate, Macetown North, Dublin 15
Location
Where the site is
- Area
- Dublin 15, Dublin
- County
- Dublin
Addresses on the notices
- Damastown Rise, Damastown Industrial Estate, Macetown North, Dublin 15
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of warehouse Building G and all associated works for the storage and distribution of chemicals, materials comprising of stores, marshalling area, associated plant units and ancillary works, of which the height does not exceed 13.5m, all located to the southern boundary of the secure 14.2 acre Seveso (Major Accidents Directives) site. and associated site works at Damastown Rise, Damastown Industrial Estate, Macetown North, Dublin 15.
Floor area stated for this source: 3,720 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.