Site start

Site start — Newhall

Newhall, Kildare

2 commencement notices · latest start date 02 Oct 2019 · planning reference given

Planning Part 8 26-5-08

Commencement notices
2
Latest start date
02 Oct 2019
Latest notice
50 m²
Planning reference
26-5
Location
Newhall, Kildare

Location

Where the site is

Area
Newhall, Kildare
County
Kildare

Addresses on the notices

  • Newbridge, Kildare
Location evidence needs care
  • Notice source points are up to 7.0 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.221080, -6.722205 Open point
  • Public notice source · 53.174692, -6.794347 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Construction of a Control Building for a new wastewater pumping station in Newhall, Naas, Co. Kildare, incorperating a pumping station control room, back-up generator and ESB substation

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 50 m².

Planning reference 26-5
Notice 2 Seven-day notice

Construction of a Control Building for a new wastewater pumping station in Kilbelin, Newbridge, incorporating a pumping station control room, back-up generator and provision for an ESB substation

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 52 m².

Planning reference 26-5

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.