Site start
162 Capel Street, Dublin 1
Dublin 1, Dublin
1 commencement notice · start date 26 Nov 2026 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 26 Nov 2026
- Latest notice
- 36 m²
- Planning references
- None given
- Location
- 162 Capel Street, Dublin 1
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
Addresses on the notices
- 162 Capel Street, Dublin 1
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Fit out of the single storey commercial unit located at ground floor of The July Aparthotel on Capel Street, Dublin. The unit will be fitted out for use as a barber shop and will consist of an open-plan customer area containing barber stations, a wash station, storage space and a WC. The fit-out works are confined to the named unit only as per drawing 2.5-fsc_ground_floor-plan uploaded with this commencement notice.
Floor area stated for this source: 36 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.