Site start
Building extension site start — Dublin
Dublin 4, Dublin
1 commencement notice · start date 10 Oct 2025 · planning reference given
Planning WEB1325/25 · Planning application
- Commencement notices
- 1
- Latest start date
- 10 Oct 2025
- Latest notice
- 17 m²
- Planning reference
- WEB1325/25
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
a) construction of a single storey extension to rear, b) re-roofing without structural alterations and thermal upgrade of non-habitable Attic space, c) alterations to fenestration to rear and side, d) internal modifications including thermal upgrade and airtightness, e) upgrade of space heating system and electrics, and f) all necessary site works including repointing of front and side facade and re-decoration.
Floor area stated for this source: 17 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.