Site start
Building extension site start — Dame Street
Dublin 2, Dublin
2 commencement notices · latest start date 26 Sep 2017 · planning reference given
Planning 2978/17
- Commencement notices
- 2
- Latest start date
- 26 Sep 2017
- Latest notice
- 1 unit
- Planning reference
- 2978/17
- Location
- Dublin 2, Dublin
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- Dame Street, Dublin
- Central Plaza, Dame Street, Dublin 2
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Relocation of existing sub station from the basement to ground level. New double sub station and associated switch rooms to be located to the rear of the building on to Cope St. This requires the placing of new access gates in to the existing railings onto Cope St and minor adjustment to the existing ramp on the corner of Cope St and Fownes St. Upper.
Removal of existing car park ramps to basement -2 and -1 and replacement with 2 no. car lifts and 1 no. bicycle lift and relocation of the existing access gates on to Cope Street. Decommissioning of 100 no. car park spaces in basement and provision of a new fire escape door and new louvered opening on the east elevation at Central Plaza, Dame Street, Dublin 2. No Fire Safety Cert is required. All other works described in planning grant 2978/17 will be commenced under commencement notice in a future 7 Day Notice.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.