Commencement notice group
The hotel — commencement notices
Kilkenny, Kilkenny
1 unique commencement event · latest notified commencement 02 Sep 2026 · planning references supplied
- Unique commencement events
- 1
- Latest notified commencement
- 02 Sep 2026
- Latest notice
- 8,250 m²
- Planning references supplied
- 23/60131 · ABP-319388-24
- Public location
- Kilkenny, Kilkenny
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 2360131 Kilkenny County Council
Exact appeal 319388 · Grant permission with revised conditions · 2025-02-13 · Open official case
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Kilkenny, Kilkenny
- County
- Kilkenny
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kilkenny County Council planning record Application details, status and decision record for 23/60131. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-319388-24. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
This commencement notice relates to enabling works only, comprising of the construction of the entrance access road off the N10 and all associated servicing, in accordance with the phasing drawing submitted with the approved planning applictaion. The overall development will comprise of a hotel, leisure and conference complex, incorporating the refurbishment and change of use of Hebron House (a Protected Structure) as the hotel reception with meeting rooms and offices, the development of hotel parkland and the construction of an access road off the N10 .The hotel extension off the refurbished two-storey over semi-basement Hebron House will provide a new two and three-storey hotel structure with 136 no. bedrooms, reception area, restaurant, bars, kitchen, staff room, stores, toilets, service areas, meeting rooms and conference centre and a lower ground floor level swimming pool, leisure centre, fitness suite, plant rooms and storage rooms. Within the grounds of the hotel, leisure and conference complex it is proposed to redevelop and landscape the existing walled garden and develop a landscaped parkland along the Pococke river, including footpaths and cycleways and a hotel car and bus park.A new access road is proposed from the N10 roundabout into Blanchfields land which will provide access to the proposed hotel complex and future developments on the Business Park zoned lands.Other works involve the demolition of existing outbuildings and sheds and the carrying out of all associated site development works, including a foul sewer pump station, storm drainage and attenuation, water services, ESB substation and lighting
Floor area stated for this source: 8,250 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.