Commencement notice group

Housing commencement notices — The Downs

The Downs, Westmeath

3 unique commencement events · latest notified commencement 29 Sep 2020 · planning reference supplied

View full project timeline

Unique commencement events
3
Latest notified commencement
29 Sep 2020
Latest notice
157 m²
Planning references supplied
17/6285
Public location
The Downs, Westmeath

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
The Downs, Westmeath
County
Westmeath

Notice location variants

  • Mullingar, Westmeath
  • Site A, Greatdown, The Downs, Mullingar, Co
  • Greatdown, The Downs, Mullingar, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Westmeath County Council planning record Application details, status and decision record for 17/6285. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

construction of detached dwelling with individual site vehicular entrance with domestic garage,septic tank and percolation area and all ancillary site services at Site A, Greatdown, The Downs, Mullingar, Co.Westmeath

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 157 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 17/6285
Notice 2 Commencement notice (owner-supplied)

construction of detached dwelling on site C with individual site vehicular entrance with domestic garages, septic tanks and percolation area and all ancillary site services at Greatdown, The Downs, Mullingar, Co.Westmeath

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 187 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 17/6285 Builder stated: Leech Brothers Builders Ltd
Notice 3 Commencement notice

construction of detached dwelling with domestic garage, vehicular entrance,septic tank and percolation area and all ancillary site services at Greatdown, The Downs, Mullingar, Co.Westmeath

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 168 m².

Planning reference 17/6285

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.