Site start
Unit G2 Horizon Logistics Park — site start
Dublin
6 commencement notices · latest start date 03 Aug 2026 · planning reference given
Planning FW25A/0055E · Planning application
- Commencement notices
- 6
- Latest start date
- 03 Aug 2026
- Latest notice
- 8,133 m²
- Planning reference
- FW25A/0055E
- Location
- Merryfalls & Silloge, St.Margaret's, St Margaret's, Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- Merryfalls & Silloge, St.Margaret's, St Margaret's, Dublin
- Merryfalls & Silloge, St. Margaret's, St Margaret's, Dublin
- Notice source points are up to 813 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.414515, -6.280047 Open point
- Public notice source · 53.415416, -6.271733 Open point
- Public notice source · 53.413432, -6.283037 Open point
- Public notice source · 53.413291, -6.281695 Open point
- Public notice source · 53.415233, -6.271141 Open point
- Public notice source · 53.413030, -6.281834 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of 1 no. light industrial/warehouse and associated site development works at Unit G2 Horizon Logistics Park, off R108, at the townlands of Merryfalls & Silloge, St. Margaret's, Swords, Co. Dublin.
Floor area stated for this source: 8,133 m².
The construction of 1 no. light industrial/warehouse and associated site development works at Unit F2 Horizon Logistics Park, off R108, at the townlands of Merryfalls & Silloge, St. Margaret's, Swords, Co. Dublin.
Floor area stated for this source: 7,795 m².
The construction of 1 no. light industrial/warehouse and associated site development works at Unit P3 Horizon Logistics Park, off R108, at the townlands of Merryfalls & Silloge, St. Margaret's, Swords, Co. Dublin.
Floor area stated for this source: 4,031 m².
The construction of 1 no. cafe and retail building and associated site development works at Unit P4 Horizon Logistics Park, off R108, at the townlands of Merryfalls & Silloge, St. Margaret's, Swords, Co. Dublin.
Floor area stated for this source: 505 m².
Unit F2 – Provision of an ESB Substation and switch room and associated site development works at Horizon Logistics Park, off R108, at the townlands of Merryfalls & Silloge, St. Margaret's, Swords, Co. Dublin.
Floor area stated for this source: 36 m².
Unit P4 – Provision of an ESB Substation and switch room and associated site development works at Horizon Logistics Park, off R108, at the townlands of Merryfalls & Silloge, St. Margaret's, Swords, Co. Dublin
Floor area stated for this source: 36 m².