Housing commencement notices — Newbridge

Newbridge, Kildare

1 unique commencement event · latest notified commencement 01 Mar 2019 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
01 Mar 2019
Latest notice
1 unit
Planning references supplied
18/1085
Public location
Newbridge, Kildare

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Newbridge, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 18/1085. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0048655KE BCMS open-data feed

Planning Permission is sought for extension and alterations to the existing single storey dwelling to include (a) construction of a first floor/dormer extension over existing bedroom area to provide an additional bedroom bathroom and dressing room; (b) alterations to the exterior of the building to include new windows, external insulation, also alterations to the internal layout, all to the front side and rear of the existing dwelling; (c) conversion of the existing garage to home office along with all associated site development and facilitating works at 45 The Village, Newbridge, Co. Kildare

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 260 m².

Planning reference 18/1085

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.