Site start
Housing site start — Churchtown
Churchtown, Dublin
1 commencement notice · start date 20 Nov 2017 · planning reference given
Planning D17A/0695 · Planning application
- Commencement notices
- 1
- Latest start date
- 20 Nov 2017
- Latest notice
- Scale not stated
- Planning reference
- D17A/0695
- Location
- Churchtown, Dublin
Location
Where the site is
- Area
- Churchtown, Dublin
- County
- Dublin
Addresses on the notices
- ground (mono pitch roof) and first floor (gable end roof) levels
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A. Partially demolish existing dwelling and side sheds. B. Extension to the front at ground (mono pitch roof) and first floor (gable end roof) levels. C. Extension to side at ground, first and attic floor levels. D. Conversion of existing attic space to habitable space. E. Conversion of garage at ground floor level to habitable space. F. Extension to rear at ground floor level. G. Alterations to existing front side and rear elevations. H. 2 number roof lights to front elevation. J. 3 number dormer roofs to rear elevation. K. Bike shed to front garden. I. Widening of vehicular access to front. M. All associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.