Commencement notice group
Housing commencement notices — Lower Massytown
Lower Massytown, Macroom, Cork
1 unique commencement event · latest notified commencement 19 Dec 2022 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 19 Dec 2022
- Latest notice
- 297 m²
- Planning references supplied
- 205540
- Public location
- Lower Massytown, Macroom, Cork
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Lower Massytown, Macroom, Cork
- County
- Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A change of use from existing ground floor office use and first floor apartment accommodation with attic storage, back to the original use of the entire building as a single private residential dwelling house; the demolition of an existing rear two storey bathroom extension, with part basement; an attic conversion to provide habitable living accommodation; a new rear two storey extension, alterations, renovations, elevational changes, and a raised rear terrace; all to a Protected Structure, RPS Number: 26; and all associated site works.
Floor area stated for this source: 297 m².
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.