Site start
Building extension site start — Sandymount
Sandymount, Dublin
1 commencement notice · start date 05 Jan 2015 · planning reference given
Planning 2347/14
- Commencement notices
- 1
- Latest start date
- 05 Jan 2015
- Latest notice
- Scale not stated
- Planning reference
- 2347/14
- Location
- Sandymount, Dublin
Location
Where the site is
- Area
- Sandymount, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The demolition of the existing two- storey extension to the rear of the terraced property and its replacement with a new two- storey extension. The new accommodations will consist of a new WC, kitchen and dining area on the upper ground level; with a new living area, bedroom and utility room on the lower ground level. The total gross demolition area is 30msq, the proposed total gross area of the rear extension is 75 msq.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.