Site start
Housing site start — Ballyhaunis
Ballyhaunis, Mayo
1 commencement notice · start date 29 Aug 2018 · planning reference given
Planning P17/610
- Commencement notices
- 1
- Latest start date
- 29 Aug 2018
- Latest notice
- 178 m²
- Planning reference
- P17/610
- Location
- Ballyhaunis, Mayo
Location
Where the site is
- Area
- Ballyhaunis, Mayo
- County
- Mayo
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Complete dwelling house as granted under planning permission P96/1238, namely, replace roof and windows, plastering, carpentry & joinery, flooring, studwork, window boards, plumbing, pipe- work, tanks, electrical, conduit & wiring, doors, trims, fitments, kitchen & sanitary fittings, boilers, radiators and electrical fittings. Completed to a building regulation compliant standard & in accordance with the grant of full planning permission including boundaries and driveways, Construction of extension and alter elevations, and install septic tank with percolation area all as per drawing documentation submitted together with all ancillary site works and services.
Floor area stated for this source: 178 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.