Site start
Housing site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 07 Jun 2019 · planning reference given
Planning D18A/0372 · Planning application
- Commencement notices
- 1
- Latest start date
- 07 Jun 2019
- Latest notice
- Scale not stated
- Planning reference
- D18A/0372
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Demolition of existing single storey Garage and Kitchen extension to side; 2. Construction of a new two-storey extension to the side and rear of the existing semi- detached house; 3. Conversion of existing attic space to include a new dormer window to rear; 4. Construction of a new bay window to front of house at ground floor level; 5. Construction of canopy roofs at ground floor level to front of house; 6. Insertion of three new Velux rooflights to front, side and rear of house; 7. Widening of existing vehicular entrance to the front of the house; 8. Internal refurbishment and remodelling works to the existing house; 9. Hard and soft landscaping to front and rear of the house; 10. All associated drainage and site development works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.