Site start
DCU School of Computing, Glasnevin
Glasnevin, Dublin
1 commencement notice · start date 30 Jul 2018 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 30 Jul 2018
- Latest notice
- 172 m²
- Planning references
- None given
- Location
- DCU School of Computing, Glasnevin, Dublin
Location
Where the site is
- Area
- Glasnevin, Dublin
- County
- Dublin
Addresses on the notices
- DCU School of Computing, Glasnevin, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Strip out of open plan lab L131 and offices N110C and N110D & the division of L131 into 3 separate offices and corridor and the refurbishment to the existing offices called N110C and N110D.
Floor area stated for this source: 172 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.