Site start
Housing site start — Rathgar
Rathgar, Dublin
2 commencement notices · latest start date 26 Apr 2022 · planning reference given
Planning 2797/20 · Planning application
- Commencement notices
- 2
- Latest start date
- 26 Apr 2022
- Latest notice
- 201 m²
- Planning reference
- 2797/20
- Location
- Rathgar, Dublin
Location
Where the site is
- Area
- Rathgar, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 2 consists of: the construction of 2 no. residential units consisting of: 2 no. 3 bedroom, two storey semi- detached houses accessed via Washerwoman's Lane, and associated landscaping and infrastructural works.
Floor area stated for this source: 201 m².
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
Phase 1 consists of: the demolition of a 4 bedroom, 2 storey derelict house (total floor area of 192 m2) and the construction of 2no. residential units consisting of: 2 no. 3 bedroom two storey semi- detached houses facing Orwell Road and associated landscaping and infrastructural works.
Floor area stated for this source: 277 m².
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.