Site start
Housing site start — Sutton
Sutton, Dublin
1 commencement notice · start date 08 Dec 2025 · planning reference given
Planning F25A/0749E · Planning application
- Commencement notices
- 1
- Latest start date
- 08 Dec 2025
- Latest notice
- 58 m²
- Planning reference
- F25A/0749E
- Location
- Sutton, Dublin
Location
Where the site is
- Area
- Sutton, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Sealawn, Shielmartin Road, Sutton, Dublin 13 (protected structure) renovation to the existing two storey coach house/office with replacement of the existing folding garage doors with glazed screen. Replacement of the corrugated roof covering on the adjoining garage with new pitched slate roof with the addition of solar panels to this roof with ancillary site and servicing works.
Floor area stated for this source: 58 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.