Commencement notice group

Building extension commencement notices — Lough Eske

Lough Eske, Donegal

1 unique commencement event · latest notified commencement 24 Aug 2026 · planning reference supplied

Unique commencement events
1
Latest notified commencement
24 Aug 2026
Latest notice
1 unit
Planning references supplied
25/61999
Public location
Lough Eske, Donegal

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Lough Eske, Donegal
County
Donegal
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Donegal County Council planning record Application details, status and decision record for 25/61999. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0146303DL BCMS open-data feed

Proposed works comprise the renovation and refurbishment of the existing Gate Cottage, including roof, render, windows, bargeboards and associated conservation repairs; construction of a single-storey extension connected by a flat-roofed link; installation of new building services and energy-efficiency upgrades; installation of a dedicated wastewater treatment system with polishing filter; and all associated drainage, access and site works.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 110 m².

Planning reference 25/61999

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.