Site start
Housing site start — shankill
shankill, Dublin
1 commencement notice · start date 18 Jun 2020 · planning reference given
Planning D19B/0374 · Planning application
- Commencement notices
- 1
- Latest start date
- 18 Jun 2020
- Latest notice
- Scale not stated
- Planning reference
- D19B/0374
- Location
- shankill, Dublin
Location
Where the site is
- Area
- shankill, Dublin
- County
- Dublin
Addresses on the notices
- the west corner, and new patio door to the east elevation at ground floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Internal Alterations and room re- configuration to existing house, including a new corner window at the west corner, and new patio door to the east elevation at ground floor level. New external insulation to be applied to the South, West and East elevations. The construction of a 24 square metre single storey extension with pitched roof to the front. The existing brick outer leaf to the front elevation will be replaced with new brick work similar to existing
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.