Commencement notice group

Commencement notices — Ashbourne

Ashbourne, Meath

1 unique commencement event · latest notified commencement 13 Oct 2025 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
13 Oct 2025
Latest notice
225 m²
Planning references supplied
24135
Public location
Ashbourne, Meath

Verified record connections

Planning, start and completion evidence

Exact planning records
2
Official record actions
2
Explicit planning relationships
1
Duplicate source rows consolidated
2
Exact completion events
0

Planning 24135 — CONDITIONAL · Decision 2024-06-04

Appeal Case · 320043

320043 has an exact reviewed appeal case relationship; the parent reference is not published in this projection.

An Coimisiún Pleanála · checked 2026-08-01T21:13:02+00:00

Open exact official relationship evidence

Exact appeal 320043 · Grant permission with revised conditions · 2025-01-08 · Open official case

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Ashbourne, Meath
County
Meath
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official planning, scanned-file and appeal sources are available below.

Public application drawings are available for this notice group.

Use the official drawings or scanned files to review the submitted plans and elevations.

  • Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 24135. Meath County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official scanned files · external
  • Architecture Drawings Map Exact official document for 24135. Meath County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings Map Exact official document for 24135. Meath County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings Drawing Exact official document for 24135. Meath County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings Drawing Exact official document for 24135. Meath County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Official planning file Meath County Council planning record Application details, status and decision record for 24135. Meath County Council Official link · last checked 01 Aug 2026 Exact official source shared from the planning and approval record.
    Open official planning file · external
  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for 320043. An Coimisiún Pleanála Official link · last checked 01 Aug 2026 public_exact_story_anchor_plus_same_destination_http_success
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

the construction of a new single storey pitched roof education and amenity building (225 sq.m GIA) and associated site development works, including the widening and upgrading of the existing gated entrance, a new car parking area for 13 vehicles and cycle parking, a new sewerage and surface water treatment system and an area dedicated to glamping consisting of the construction of a small single storey open-air shelter and an area reserved for up to 8 no. glamping tents

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 225 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.