Commencement notice group
Housing commencement notices — Naas
Naas, Kildare
1 unique commencement event · latest notified commencement 02 Oct 2017 · planning references supplied
- Unique commencement events
- 1
- Latest notified commencement
- 02 Oct 2017
- Latest notice
- 82 units
- Planning references supplied
- 09/500050 · 15/955
- Public location
- Naas, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 1
- Duplicate source rows consolidated
- 0
- Exact completion events
- 0
- Open exact official planning record: 15/955 Kildare County Council · checked 2026-07-30T21:45:00Z
Extension of duration · 15/955 → 09/500050
15/955 is recorded as extension of duration 09/500050.
Kildare County Council · checked 2026-07-30T21:45:00ZPlanning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Naas, Kildare
- County
- Kildare
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 15/955. Kildare County Council Official link · last checked 30 Jul 2026 Exact official source shared from the planning and approval record.Open extension-of-duration file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A residential development of 86 Houses (26 no. 4-bed 2½ storey semi-detached, 18 no. 3-bed 2-storey semi-detached, 26 no. 4-bed 2-storey terraced and 16 no. 3 bed 2 storey terraced); 147 no. duplex units in 3 storeys (9 no. 1 bed, 41 no. 2-bed, 87 no. 3 bed & 10 no. 4 bed) in 18 no. blocks; 75 no. apartments (6 no. 1 bed, 65 no. 2 bed & 4 no. 3 bed) in 2 no. 3/4 storey blocks with associated basement/surface carparking and site & development works and a 2 storey crèche (580 sq. m.) with outdoor play area. The proposal also includes the construction of the Devoy Link Road in accordance with Development Plan Objectives. All on a 9.17 ha site north of Naas Southern Ring Road and west of the proposed Devoy Link Road, Jigginstown, Naas West, Co. Kildare. Vehicular access will be from two points on the proposed Devoy Link Road. This commencement notice relates to the construction of Phase 1. Phase 1 comprises of 82 no. units (55 no. 4 bed houses and 27 no. 3 bed houses) and associated access roads, landscaping and open space. This commencement notice relates to House numbers 1 -20 The Walk, 1 - 61 The Green and 1 The Grove, Elsmore.
Floor area stated for this source: 9,840 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.