Site start
Housing site start — Dublin
DUBLIN 18, Dublin
1 commencement notice · start date 09 Jul 2025 · planning references given
Planning ABP-308418-20, LRD24A/0396/WEB
- Commencement notices
- 1
- Latest start date
- 09 Jul 2025
- Latest notice
- 5 units
- Planning references
- LRD24A/0396/WEB · ABP-308418-20
- Location
- DUBLIN 18, Dublin
Location
Where the site is
- Area
- DUBLIN 18, Dublin
- County
- Dublin
Addresses on the notices
- the ground floor of the development with a podium deck above
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-308418-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change of use to Blocks B, C and D to accommodate 5no. additional apartments to the previous ground-floor amenity spaces commenced under commencement notice validation references,. The overall development consists of the construction of 4 residential buildings, Block A,B, C, and D, extending from four storeys to seven storeys in height over the ground floor. Car parking is provided at the ground floor of the development with a podium deck above. The total number of apartments is increased to 198. The development is to be known as Blocks A, B and C, D of Abingdon Residential Development located at at 10 Shanganagh Road, Shankill, Dun Laoghaire-Rathdown, Dublin 16
Floor area stated for this source: 280 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.