Site start

Housing site start — Rathgar

Rathgar, Dublin

1 commencement notice · start date 11 Nov 2014 · planning reference given

Planning 2069/14

Commencement notices
1
Latest start date
11 Nov 2014
Latest notice
2 houses
Planning reference
2069/14
Location
Rathgar, Dublin

Location

Where the site is

Area
Rathgar, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

PROTECTED STRUCTURE: Revision to an approved development Reg. Ref 2450/11 (PL29S.239131). The revision will comprise the omission of 2 no. 2 storey over basement, 3-bedroom semi-detached houses and the provision of 2 no. 2 storey over basement, 3-bedroom detached houses and associated site development works above and below ground.

Work stated for this notice 2 houses Explicit phase quantity stated by the source.
Planning reference 2069/14

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.