Site start
Fair Street, Mallow
Mallow, Cork
1 commencement notice · start date 01 Nov 2016 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 01 Nov 2016
- Latest notice
- 1 unit
- Planning references
- None given
- Location
- Fair Street, Mallow, Cork
Location
Where the site is
- Area
- Mallow, Cork
- County
- Cork
Addresses on the notices
- Fair Street, Mallow, Cork
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The proposed development will comprise material alterations and extension of the ground floor level of an existing two storey school building. The material alterations and extension will consist of the following: • The amalgamation of three existing classrooms into one Woodwork classroom. • The provision of a new FD60S fire door to the existing Boiler room located off the existing corridor. • The replacement of the existing final exit door from the corridor with a new final exit door (one and a half leaf door). • Blocking up two number exits into the existing corridor and the provision of a new connecting door into the proposed new woodwork preparation room extension. • New Extension to provide a woodwork preparation area.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.