Site start

Housing site start — Sallins

Sallins, Kildare

8 commencement notices · latest start date 01 Jun 2021 · planning reference given

Planning 16/254 · Council file · external

Commencement notices
8
Latest start date
01 Jun 2021
Latest notice
139 m²
Planning reference
16/254
Location
Sallins, Kildare

Location

Where the site is

Area
Sallins, Kildare
County
Kildare
Location evidence needs care
  • Notice source points are up to 318 m apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.249806, -6.658359 Open point
  • Public notice source · 53.251967, -6.655230 Open point
  • Public notice source · 53.251299, -6.655619 Open point
  • Public notice source · 53.251660, -6.656068 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Crèche building.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 139 m².

Planning reference 16/254
Notice 2 Commencement notice (owner-supplied)

2 no. two-storey, detached houses.

Work stated for this notice 2 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 334 m².

Planning reference 16/254
Notice 3 Commencement notice (owner-supplied)

5-bedroom, detached house.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 155 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 16/254
Notice 4 Commencement notice

14 no. two-storey, detached dwelling houses, comprising 5 no. Type E and 9 no. Type F on plots 81-94.

Work stated for this notice 14 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 2,243 m².

Planning reference 16/254
Notice 5 Commencement notice (owner-supplied)

2 no. 2 storey, 4 bedroom detached houses.

Work stated for this notice Scale not stated for this notice.

Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.

Planning reference 16/254
Notice 6 Commencement notice

3 no. 2.5 storey, 5 bedroom detached houses.

Work stated for this notice 3 houses Explicit phase quantity stated by the source.
Planning reference 16/254
Notice 7 Commencement notice (owner-supplied)

2 no. two bedroom 2.5 storey apartments (Type A) and 2 no. three bedroom 2.5 storey apartments (Type B) in 1 no. 2.5 storey block.

Work stated for this notice Scale not stated for this notice.

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Planning reference 16/254
Notice 8 Commencement notice (owner-supplied)

2.5 storey, 5 bedroom detached house.

Work stated for this notice Scale not stated for this notice.

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 16/254

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.