Site start
Housing site start — Sallins
Sallins, Kildare
8 commencement notices · latest start date 01 Jun 2021 · planning reference given
Planning 16/254 · Council file · external
- Commencement notices
- 8
- Latest start date
- 01 Jun 2021
- Latest notice
- 139 m²
- Planning reference
- 16/254
- Location
- Sallins, Kildare
Location
Where the site is
- Area
- Sallins, Kildare
- County
- Kildare
- Notice source points are up to 318 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.249806, -6.658359 Open point
- Public notice source · 53.251967, -6.655230 Open point
- Public notice source · 53.251299, -6.655619 Open point
- Public notice source · 53.251660, -6.656068 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Crèche building.
Floor area stated for this source: 139 m².
2 no. two-storey, detached houses.
Floor area stated for this source: 334 m².
5-bedroom, detached house.
Floor area stated for this source: 155 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
14 no. two-storey, detached dwelling houses, comprising 5 no. Type E and 9 no. Type F on plots 81-94.
Floor area stated for this source: 2,243 m².
2 no. 2 storey, 4 bedroom detached houses.
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
3 no. 2.5 storey, 5 bedroom detached houses.
2 no. two bedroom 2.5 storey apartments (Type A) and 2 no. three bedroom 2.5 storey apartments (Type B) in 1 no. 2.5 storey block.
Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.
2.5 storey, 5 bedroom detached house.
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.