Site start
Building extension site start — Glasnevin
Glasnevin, Dublin
1 commencement notice · start date 16 Nov 2015 · planning reference given
Planning 3248/15
- Commencement notices
- 1
- Latest start date
- 16 Nov 2015
- Latest notice
- Scale not stated
- Planning reference
- 3248/15
- Location
- Glasnevin, Dublin
Location
Where the site is
- Area
- Glasnevin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Opt Out - a) Demolition of single storey kitchen extension, 4.7m2 in area, to rear. b) Construction of part single storey, part two storey extension, 62.7m2 in area, to side and rear comprising kitchen/dining area, utility room and study on ground floor and two bedrooms and shower room on first floor. c) Internal modifications comprising guest wc on ground floor and conversion of existing boxroom to ensuite bathroom on first floor.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.