Site start

The works consist installation of temporary building at hospital site

Mullingar, Westmeath

1 commencement notice · start date 29 Oct 2014 · planning reference given

Planning 14-6011 · Council file · external

Commencement notices
1
Latest start date
29 Oct 2014
Latest notice
1 unit
Planning reference
14-6011
Location
Mullingar, Westmeath

Location

Where the site is

Area
Mullingar, Westmeath
County
Westmeath

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The works consist installation of temporary building at hospital site for Emergency Department with required services and site layout modification and construction of a service plant for time of renovation works within the main hospital building at MRH Mullingar. This temporary accommodation is to be a detached single story unit linked to the main hospital building via east stairs of existing five storey block. The building is to be constructed of proprietary modular units to performance specification, general arrangement plans, sections and elevations provided and specialist subcontractor's details and specification. All mechanical and electrical services has been adequately detailed at design stage. The Emergency Department is to be decant to its current location after the modernisation works within main hospital building completion. The temporary building will be removed from site and all site elements to be reinstated.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference 14-6011

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.