Site start

Building extension site start — Malahide

Malahide, Dublin

1 commencement notice · start date 21 May 2018 · planning reference given

Planning F17A0607

View full project timeline

Commencement notices
1
Latest start date
21 May 2018
Latest notice
1 unit
Planning reference
F17A0607
Location
Malahide, Dublin

Location

Where the site is

Area
Malahide, Dublin
County
Dublin

Addresses on the notices

  • the rear
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Demolition of existing single storey and two storey extension at the rear. Construction of a part single storey and part two storey extension at the rear with roof lights. Conversion of attic to storage room with roof lights to rear. Internal alterations. Ancillary site works. All at No.3 Killeen Terrace (A Protected Structure).

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 126 m².

Planning reference F17A0607

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.