Commencement notice group

Commencement notices — Carlow

Carlow, Carlow

1 separate notice · latest notified commencement 05 Nov 2020 · planning basis not stated

Source notices
1
Latest notified commencement
05 Nov 2020
Latest notice
500 m²
Planning references supplied
None stated
Public location
Carlow, Carlow

Public source geography

Site location

Public site / locality
Carlow, Carlow
County
Carlow
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0070059CW BCMS owner-supplied export

Provision of Covid-19 Test Centre on the grounds of St. Dympna's Hospital Carlow. The development consists of a modular building and enclosed test area to facilitate drive through and pedestrian access for Covid-19 testing. The building consists of administration and medical storage rooms, toilets and staff canteen. Road access is from an existing roadway access off the Old Dublin Road, Carlow. New site services are required from the existing St. Dympna's infrastructure to service the building, including domestic LPG gas tank.

500 m² · stated on this notice

Builder stated: Robert Quinn Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.