Site start
Commercial site start — Cork
Cork
1 commencement notice · start date 10 Mar 2025 · planning reference given
Planning 24/5692 · Planning application
- Commencement notices
- 1
- Latest start date
- 10 Mar 2025
- Latest notice
- 1,657 m²
- Planning reference
- 24/05692
- Location
- Wallingstown, Little Island, Cork
Location
Where the site is
- Area
- Cork
- County
- Cork
Addresses on the notices
- Wallingstown, Little Island, Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a Steel portal frame type extension onto the north (rear) of an existing warehouse/light industrial unit, some renovations to the existing building including internal alterations to layouts, replacement of the wall cladding, addition of 2 roller doors, construction of open canopy to the east elevation.
Floor area stated for this source: 1,657 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.