Site start
Midland Regional Hospital — site start
Portlaoise, Laois
2 commencement notices · latest start date 13 Apr 2016 · planning reference given
Planning 14/70 · Council file · external
- Commencement notices
- 2
- Latest start date
- 13 Apr 2016
- Latest notice
- Scale not stated
- Planning reference
- 14/70
- Location
- Block Road, Portlaoise
Location
Where the site is
- Area
- Portlaoise, Laois
- County
- Laois
Addresses on the notices
- Block Road, Portlaoise
- Midland Regional Hospital, Block Road, Portlaoise
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development at Midland Regional Hospital , Block Road , Portlaoise, Co. Laois consisting of Phase 2 of a single storey building with link corridor to a new Acute Medical Assessment Unit (AMAU) and Day Services Unit
Development at Midland Regional Hospital, Block Road, Portlaoise, Co. Laois ,a Protected Structure consisting of a new two storey building providing a new Acute Medical Assessment Unit (AMAU) and Day Services Unit together with new link corridor within the existing main hospital building with total gross floor area of 1445 M2 and associated relocation of 3 no. existing site cabins with total gross floor area of 57 M2 , overall total floor area 1502 M2 & associated site and landscaping works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.