Site start
Building extension site start — Adare
Adare, Limerick
1 commencement notice · start date 08 Jul 2015 · planning reference given
Planning 10529 · Council file · external
- Commencement notices
- 1
- Latest start date
- 08 Jul 2015
- Latest notice
- Scale not stated
- Planning reference
- 10529
- Location
- Adare, Limerick
Location
Where the site is
- Area
- Adare, Limerick
- County
- Limerick
Addresses on the notices
- Tuogh Adare
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Raising height of existing cottage by 0.9m, construct 2 dormer windows to front elevation, 1 dormer and 1 roof window to rear elevation, demolish attached garage on west elevation with addition of 2 ground floor windows on same, addition of window to east and front elevations and alteration to window/door location on front elevation, demolish large rear extension and construct smaller dormer style extension in its place, construction of garage to the rear, installation of proprietary treatment system and percolation area and upgrade existing entrance to the east at Tuogh Adare
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.