Site start
Housing site start — Lusk
Lusk, Dublin
1 commencement notice · start date 15 Mar 2017 · planning reference given
Planning F15A/0598 · Planning application
- Commencement notices
- 1
- Latest start date
- 15 Mar 2017
- Latest notice
- Scale not stated
- Planning reference
- F15A/0598
- Location
- Lusk, Dublin
Location
Where the site is
- Area
- Lusk, Dublin
- County
- Dublin
Addresses on the notices
- Cluainín Innis, Skerries Road, Lusk, Co
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The demolition of the existing 2 storey house, the existing rear single storey shed, the existing front boundary wall and the existing front vehicular entrance and the construction of a new 2 storey house with 2 non habitable rooms in the attic, a new rear single storey detached 2 car garage, a new front boundary wall, a new front vehicular entrance, an new front pedestrian entrance and ,all associated site works at Cluainín Innis, Skerries Road, Lusk, Co. Dublin
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.