Site start

Hettyfield Gardens — site start

Douglas, Cork

1 commencement notice · start date 12 Sep 2023 · planning references given

Planning ABP 311652-21 [2139825]

Commencement notices
1
Latest start date
12 Sep 2023
Latest notice
1,453 m²
Planning references
2139825 · ABP-311652-21
Location
Douglas, Cork

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Exact appeal 311652 · Grant permission with revised conditions · 2023-05-17 · Open official case

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Douglas, Cork
County
Cork

Addresses on the notices

  • Hettyfield Gardens, Hettyfield, Douglas, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Cork City Council planning record Application details, status and decision record for 2139825. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-311652-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of 9no. three storey dwellings at Hettyfield Gardens, Hettyfield, Douglas, Cork. [House Nos 1-9]

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,453 m².

Source unit value with scope not stated: 9 houses. It is not presented as notice-specific scale.

Planning reference 2139825 Appeal reference ABP-311652-21 Developer stated: Forostar Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.