Site start
Building extension site start — Doolin
Doolin, Clare
1 commencement notice · start date 12 Oct 2020 · planning reference given
Planning P19/119
- Commencement notices
- 1
- Latest start date
- 12 Oct 2020
- Latest notice
- 1,179 m²
- Planning reference
- P19/119
- Location
- Doolin, Clare
Location
Where the site is
- Area
- Doolin, Clare
- County
- Clare
Addresses on the notices
- the Doolin Hostel, Doolin, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) Change of use of (a) existing bicycle and surf/climbing areas to a conference/meeting room, (b) existing ground floor area to hostel use (2) roof over existing courtyard to provide a recreational area (3) extend existing storage room to provide a loading bay/prep kitchen at the Doolin Hostel, Doolin, Co. Clare.
Floor area stated for this source: 1,179 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.