Site start
Housing site start — Drumfin
Drumfin, Sligo
1 commencement notice · start date 04 Aug 2017 · planning reference given
Planning 17133 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 04 Aug 2017
- Latest notice
- 1 house
- Planning reference
- 17133
- Location
- Drumfin, Sligo
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 17133 Sligo County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Drumfin, Sligo
- County
- Sligo
Addresses on the notices
- first floor level, alteration to elevations of existing dwelling house
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Sligo County Council planning record Application details, status and decision record for 17133. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Opt Out to construct an extension on the West elevation of existing dwelling house, Forming of new roof on existing dwelling with raised ridge level and attic development at first floor level, alteration to elevations of existing dwelling house. Decommission of existing septic tank and installation of septic tank and percolation area and upgrade of existing residential entrance.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.